Valle del Sol Residence

project img
project img items
project img items
project img items

Gray work, white work, and mechanical work: construction of 2 levels. Level 1 of 400 m² and Level 2 of 122 m². Combined construction system of conventional and lightweight masonry, with concrete columns and beams, armabloque-type mezzanine with pre-stressed beams, Styrofoam, and concrete with welded mesh. Metal structure for roofs and railings, general roof covering with tiles, walls with fine plaster, paste, and paint. Ceilings made of gypsum with wooden coffered ceilings on terraces; eaves in fibrolite with wooden coffered ceilings; moldings on columns, beams, windows, and doors. General mechanical installation: sanitary slabs, faucets, showers, washbasins, laundry tubs, sinks, irrigation systems, provisions for a machine room. Perimeter walls in masonry with fine plaster and paint finish. Construction of a machine room and vehicular access in stamped concrete.

Ubication:

Lindora, San Jose

General Progress:

100%