Home > Projects
Gray labor: Two-story building, level 1 of 600 m² y level 2 of 300 m². Conventional masonry construction system, concrete columns and beams, with rough and fine plastering, floating slab floor with welded wire mesh, concrete stairs, intermediate floor with pre-stressed beams, and reinforced concrete slab.
Ubication:
San Ana, San Jose
General Progress:
100%