Inicio > Proyectos



Gray labor, white work, electromechanical, and pool: 1-level building of 156 m² and pool with terrace of 24 m². Combined construction system of conventional and lightweight masonry, concrete columns and beams, metal roof structure, general roof cover with custom-sized rectangular zinc, walls with fine plaster and paint, PVC panel ceilings. General mechanical installation: sanitary slabs, faucets, showers, sinks, laundry tubs, sinks. General electrical installation: lights, outlets, switches, and water heater. Pool construction with masonry walls, thick plaster, fine plaster with waterproofing, construction of machine house, pool equipment connection, and commissioning.
Ubication:
Bahia Ballena, Osa, Puntarenas
General Progress:
100%